Thursday, March 22, 2012

Where am I so far???


My intentions for the Winter 2012 repair schedule have changed radically and unexpectedly in the last few weeks. So I decided to see what has been done vs. was intended. 

As originally intended:
  1. Replace engine mounts - DONE
  2. Replace catalytic converter - DONE
  3. Replace muffler heat shield - DONE
  4. Test and recharge A/C system
  5. Change belts and tighten - DONE
  6. Flush transmission fluid
  7. Install clutch bleeder kit, flush clutch fluid - INSTALLED, NOT BLED
  8. Oil change
  9. Test otterstat - DONE/REPLACED
  10. Fix luggage compartment latch
  11. Fix rear louvers latch
  12. Replace engine light switch
  13. Replace rear fascia
  14. Replace vacuum cap on charcoal canister - DONE
  15. Recondition steering column ends
  16. Replace seal cap on passenger side, lower body
  17. Lower rear springs - DONE
  18. Flush cooling system and refill - DONE


Unexpected/added tasks:
  1. Tighten all coolant hose connections - DONE
  2. Replace water pump - DONE
  3. Replace cracked muffler bracket - DONE
  4. Acquire longer M7 bolts for A/C idler pulley attachments - DONE
  5. TimeSert stripped threads in timing cover at A/C idler pulley - DONE
  6. Clean engine "valley" due to coolant leaks - DONE (TWICE)
  7. Replace sparkplugs - DONE
  8. Replace sparkplug wires - DONE
  9. Replace distributor cap - DONE
  10. Replace rotor - DONE
  11. Clean fuel injectors
  12. Replace injector seals and clips - DONE
  13. Replace fuel filter - DONE
  14. Replace Control Pressure Regulator - DONE
  15. Clean Idle Speed Motor
  16. Replace all o-rings and gaskets on intake manifold
  17. Replace all bolts on cross-over pipe - DONE
  18. Re-secure T-roof panel